Build Your Project for Electrical with Takeoff Projects

The purpose of this project is to explain power quality that exists in the AC system and has emerged as a major issue because there has been a rapidly growing adoption of inductive loads, and electronic equipment (Linear and Nonlinear load). An undefined portion of the electrical energy daily because of the low power factor in the inductive loads that you use in the system. Therefore, the situation calls for an urgent need in order to avoid this waste of energy, poor power factor, and reactive power